German Emergency Housing

The quickest solution to build emergency homes, like this project in Germany, is to manufacture large modules that can contain 2 or 3 homes with all facilities included.

After arrival on site and placing them with a crane on a simple 8 block foundation, they can be used the same day. The modules have connections for sewage, water and power in one spot for easy and quick connection to the public utilities.

​The units are designed to be used as a single floor. Since no stacking and staircases are needed, they are ready to use instantly.

In this project the heating is provided with electric wall mounted radiators. The PIR filled insulation panels provide excellent energy performance as well as sound reduction and fire resistance.

​After arrival on site the modular homes can be used the same day and offers accommodation for up to 8 persons.